Installing a PNW Coast dropper post involves a few key steps to ensure proper function and cable routing. Here's a guide based on the provided reference, focusing on the cable attachment at the lever:
Cable Installation at the Lever (PNW Components Example)
The provided reference primarily details the cable installation at the lever end, which is a crucial part of the dropper post installation. Here's how to do it:
- Positioning the Cable: Slide the cable under the 3mm cable anchor bolt on the lever.
- Lever Position: Ensure the lever is in its default position (unactuated).
- Securing the Cable: While holding the excess cable, tighten the cable anchor bolt to secure the cable in place.
Summary Table
Step | Description |
---|---|
1. Cable Positioning | Slide the cable under the 3mm cable anchor bolt. |
2. Lever Position | Keep the lever in its default (unactuated) position. |
3. Cable Securing | Tighten the cable anchor bolt while holding the excess cable in position. |