How Long Do Clay Bricks Take to Dry?

Published in Clay Brick Manufacturing 2 mins read

Clay bricks typically take between 18 to 40 hours to dry in an automated plant, but this duration can significantly vary depending on the type and size of the brick.

The drying process is a critical step in brick manufacturing, removing moisture before the bricks are fired in a kiln. The time required is influenced by several factors, including humidity, temperature, airflow, and the composition and size of the clay unit.

Typical Drying Times for Clay Bricks

Based on common industry practices, the drying time can be categorized as follows:

  • Standard Bricks (Automated Plants): For standard-sized bricks processed in modern automated facilities, the drying process typically takes between 18 to 40 hours. This controlled environment allows for consistent and relatively quick moisture removal.
  • Special Shapes and Large Units: Bricks with unique shapes, larger dimensions, or denser compositions require a longer drying period to ensure all moisture is adequately removed from the entire mass. These units can take up to a week or more to dry completely.

Drying Time Summary

Brick Type Typical Drying Time
Standard (Automated Plant) 18 to 40 hours
Special Shapes / Large Up to a week or more

Once the bricks are sufficiently dry, they are ready for the next stage: firing. The firing process, which involves burning the clay in a kiln, is a separate step and typically takes an average of 3 to 4 days. This high-temperature firing hardens the clay, giving the bricks their strength and durability, and occurs after the drying phase is complete.

Efficient drying is crucial to prevent issues like cracking or warping during the subsequent firing process, ensuring the production of high-quality bricks.