Using ready set concrete, also known as rapid set concrete, typically involves a straightforward process to quickly set posts or poles. Here's a guide:
-
Pour Half the Bag: Pour about half the bag of Rapid Set Concrete directly into the hole where your post or pole is situated. Ensure that the concrete is evenly distributed around the post. It's important to work without delay, as this concrete sets relatively quickly.
-
Tamp the Concrete: Use a rod or similar tool to tamp the concrete around the post. This helps to remove air pockets, which can weaken the set concrete.
-
Add Remaining Concrete: Pour the remaining half of the bag into the hole, continuing to distribute it evenly.
-
Tamp Again: Tamp the concrete again with the rod to ensure that it is well-compacted and that any remaining air pockets are removed.
Important Considerations:
- Some ready set concretes require the addition of water. Always check the manufacturer's instructions on the bag. If water is needed, carefully follow the recommended amount to avoid a weak concrete mixture.
- Wear appropriate safety gear such as gloves and eye protection when handling concrete.
- The concrete sets relatively quickly. Work efficiently once the concrete is poured.