Core filling concrete blocks strengthens walls and provides increased structural stability. The process generally involves filling the hollow cores of the blocks with concrete or grout, often in conjunction with vertical rebar reinforcement. Here's a breakdown of how it's typically done:
Steps to Core Fill Concrete Blocks
-
Preparation:
- Mortar Joints: Ensure mortar joints are properly filled and cured to prevent leakage during filling.
- Clean Cores: Remove any debris, mortar droppings, or obstructions from inside the block cores. Compressed air can be helpful.
- Reinforcement: Install vertical reinforcing steel (rebar) within the cores according to your structural plans and local building codes. The size and spacing of the rebar are critical for the wall's strength.
- Bracing (If Necessary): For tall or unstable walls, temporary bracing may be required to prevent bowing or movement during the filling process.
-
Mixing the Concrete/Grout:
- Mix Design: Use a concrete or grout mix specifically designed for core filling. This usually involves a high-slump (flowable) mix that can easily fill the voids and consolidate around the rebar. Admixtures may be added to improve workability and reduce shrinkage. Consult local building codes or a structural engineer for appropriate mix designs.
- Consistency: The mix should be fluid enough to flow into all areas of the core without excessive voids, but not so watery that it segregates.
-
Filling the Cores:
- Lifts: Filling is typically done in "lifts," or layers. The height of each lift depends on the mix design and block size, but generally does not exceed 4 feet. Refer to the local building codes for maximum lift height.
- Pouring: Pour the concrete or grout slowly and carefully into the cores. A funnel or tremie (a pipe used to deliver concrete to the bottom of a form) can help prevent segregation and ensure even distribution.
- Consolidation: After each lift, consolidate the concrete or grout to eliminate air pockets and ensure proper bonding with the blocks and rebar. This can be done with a vibrator designed for concrete, or by rodding the mix with a long, thin rod. Avoid over-vibrating, which can cause segregation.
-
Curing:
- Moisture Control: Keep the filled cores moist during the curing process (typically 3-7 days) to ensure proper hydration and strength development of the concrete or grout. This can be achieved by covering the top of the wall with plastic sheeting or by periodically spraying water into the cores.
Addressing the Reference
The provided reference mentions drilling a hole and cementing rows together:
- Drilling a hole and inserting rebar several rows up: While not the typical core filling process, the reference likely describes retrofitting an existing wall. This is not standard construction and requires engineering expertise.
- Cementing the bottom rows together: This likely refers to ensuring a solid foundation for the wall. Mortar joints in the base course must be well-filled. It does not eliminate the need for anchoring the wall to the foundation, which is crucial.
Important Considerations
- Building Codes: Always adhere to local building codes and regulations, which dictate specific requirements for core filling, including mix designs, rebar size and spacing, and inspection procedures.
- Professional Advice: Consult with a structural engineer or experienced concrete contractor to ensure the core filling is done correctly and meets the required structural load requirements.
- Inspection: Core filling is often subject to inspection by local building officials to ensure compliance with codes and specifications.