askvity

How Are Precast Slabs Made?

Published in Concrete Manufacturing Process 3 mins read

Precast slabs are manufactured in a controlled environment off-site before being transported and installed at the construction location.

The Precast Slab Manufacturing Process

The creation of precast concrete slabs involves several key steps, primarily occurring in a dedicated facility or plant. This controlled setting ensures consistency and quality before the elements reach the job site.

Here's a breakdown of the typical process:

Molding and Reinforcement

The initial step involves preparing the mold. Precast concrete is poured into a wooden or steel mold. These molds define the shape and dimensions of the final slab.

Within the mold, wire mesh or rebar is placed as reinforcement. This steel framework significantly enhances the slab's structural strength and durability. Depending on the specific requirements for the slab's load-bearing capacity and span, the mold may also have prestressed cable, if needed. Prestressed cables are tensioned before the concrete is poured and released after curing, compressing the concrete and allowing it to carry heavier loads over longer distances.

Curing

Once the concrete is poured into the reinforced mold, it needs to harden and gain strength. This process, known as curing, is crucial. It is cured in a controlled environment — usually at a plant. This control over temperature, humidity, and other environmental factors ensures optimal concrete hydration and strength development, which might be difficult to achieve reliably on an open construction site.

Transportation and Installation

After the concrete has properly cured and reached the required strength, the precast slab is removed from the mold. The finished slab is then transported to a construction site and put into place. This transport requires specialized equipment due to the weight and size of the slabs. Installation typically involves lifting the slabs into position using cranes and securing them according to the project's structural design.

Here is a simplified overview of the stages:

  • Preparation: Setting up wooden or steel molds.
  • Reinforcement: Placing wire mesh, rebar, and potentially prestressed cables.
  • Pouring: Filling the molds with concrete.
  • Curing: Allowing the concrete to harden in a controlled environment.
  • Demolding: Removing the hardened slab from the mold.
  • Transport: Moving the finished slab to the construction site.
  • Installation: Lifting and placing the slab into its final position.

This manufacturing method offers advantages such as faster construction timelines on site, higher quality control, and reduced labor requirements at the final location compared to casting concrete in place.