According to the provided reference, you need 7.5 bags of cement for 1 cubic meter of M30 grade concrete.
Understanding Concrete Grades and Mix Proportions
Concrete is classified into different grades based on its compressive strength. M30 is a common grade used for various structural purposes, indicating that it should achieve a minimum characteristic compressive strength of 30 N/mm² after 28 days.
The properties of concrete, including its strength, are determined by the mix proportion of its constituent materials: cement, sand (fine aggregate), and aggregates (coarse aggregate).
The reference details the nominal mix proportions and corresponding cement requirements for different concrete grades:
Grade of Concrete | Nominal Mix Proportion | Cement Required (bag)/cum |
---|---|---|
M15 | 1:3:6 | 4.5 |
M20 | 1:2:4 | 6 |
M25 | 1:1.75:3.5 | 6.75 |
M30 | 1:1.5:3 | 7.5 |
For M30 grade concrete using a nominal mix of 1:1.5:3, the proportion means 1 part cement, 1.5 parts sand, and 3 parts coarse aggregate by volume. The reference clearly states that for this grade and mix, the cement requirement is 7.5 bags per cubic meter (cum).
Practical Considerations
While 7.5 bags per m³ is the quantity indicated by the reference for a nominal mix, the actual amount of cement required can sometimes vary slightly depending on factors like:
- Type of cement: Different types may have slightly different bulk densities.
- Specific gravity and moisture content of aggregates: These affect the volume calculations.
- Workability requirements: Higher slump might require more cement paste.
- Wastage: Some material loss can occur during mixing, transportation, and placing.
However, for a standard calculation based on the nominal mix provided, 7.5 bags per m³ is the figure to use for M30 concrete.
Building Materials