Mixing cement and gravel, along with sand and water, creates concrete. The traditional rule of thumb is to use a ratio of 1 part cement, 2 parts sand, and 3 parts gravel by volume. Here’s a step-by-step guide:

Step-by-Step Guide to Mixing Cement, Sand, and Gravel (Concrete)

  1. Gather Your Materials:

    • Cement (Portland cement is commonly used)
    • Sand (clean construction-grade sand)
    • Gravel (aggregate or crushed stone)
    • Water (clean and potable)
    • Mixing container (wheelbarrow, mortar tub, or concrete mixer)
    • Shovel or hoe
    • Measuring containers (buckets or similar)
    • Gloves and eye protection
  2. Determine the Correct Ratio: The standard ratio is 1 part cement : 2 parts sand : 3 parts gravel. Adjust the quantities based on your project's size. For example, you might use 1 bucket of cement, 2 buckets of sand, and 3 buckets of gravel.

  3. Dry Mixing: In your mixing container, combine the cement, sand, and gravel in dry form. Use a shovel or hoe to thoroughly mix these ingredients until the mixture is a uniform color. This ensures even distribution before adding water.

  4. Adding Water Gradually: Create a well in the center of the dry mixture. Slowly add water, a little at a time, while continuously mixing. The goal is to achieve a workable consistency.

  5. Achieving the Right Consistency: The concrete should be wet enough to be easily worked with, but not so wet that it's soupy. A good test is to create a small mound with your shovel. It should hold its shape without slumping excessively. If the mixture is too dry, add more water. If it's too wet, add more of the dry cement, sand, and gravel mixture in the correct ratio.

  6. Mix Thoroughly: Continue mixing until the concrete is smooth and consistent, with no dry pockets of cement or aggregate. This may take several minutes, especially when mixing by hand.

  7. Using the Concrete Promptly: Once mixed, use the concrete promptly. Concrete begins to set soon after mixing, so avoid letting it sit for too long before placement.

Mixing with a Concrete Mixer

If you’re using a concrete mixer, the process is similar, but the machine does the heavy lifting:

  1. Add Gravel First: Start by adding about half of the gravel and half of the water to the rotating mixer.

  2. Add Cement and Sand: Gradually add the cement and sand while the mixer is running.

  3. Add Remaining Gravel and Water: Add the remaining gravel and water slowly, adjusting the water amount as needed to achieve the correct consistency.

  4. Mix for Several Minutes: Allow the mixer to run for several minutes to ensure thorough mixing.

  5. Empty the Mixer: Tilt the mixer to pour the concrete into your desired location or container.

Important Considerations

  • Safety: Always wear gloves and eye protection when working with cement and concrete. Cement can irritate the skin and eyes.
  • Water Quality: Use clean, potable water. Impurities in the water can affect the strength and durability of the concrete.
  • Adjusting the Ratio: Depending on the application, you might need to adjust the ratio of cement, sand, and gravel. For example, for a stronger mix, you might increase the amount of cement.
  • Curing: Once the concrete is poured and shaped, it needs to be cured properly to gain full strength. This involves keeping it moist for several days.