Dryzone is a damp-proofing cream used to create a barrier against rising damp. Here’s how to use it, based on the provided reference:
Steps for Applying Dryzone
The provided video reference outlines the following steps for using Dryzone damp-proofing cream. It is designed for use in pre-drilled holes and comes ready to use.
-
Preparation:
- Ensure you have the Dryzone product and the appropriate application gun.
- Pre-drill holes along the mortar line of the wall as specified by the manufacturer. This will ensure the Dryzone is applied at the correct depth.
-
Application:
- Insert the delivery tube fully into the pre-drilled hole.
- Gently squeeze the gun trigger.
- Continue to fill the hole with Dryzone cream, stopping when it is approximately one centimeter from the surface. This ensures that enough cream is applied while leaving room for subsequent sealing.
Key Considerations
- Ready to Use: Dryzone cream is designed to be ready to use straight from the tube.
- Depth: Make sure that the delivery tube is fully inserted into the pre-drilled hole to maximize the cream's effectiveness.
- Back Filling: Fill each hole to within one centimeter of the surface. This provides a reservoir of cream and allows room for the surface to be sealed later.
Summary of Dryzone Application
Step | Action |
---|---|
1. Prepare | Pre-drill holes in the mortar line. |
2. Insert | Insert the delivery tube into each hole. |
3. Fill | Squeeze the gun and fill each hole with cream until it’s one centimeter from the surface. |
Using Dryzone correctly involves pre-drilling holes, inserting the delivery tube and carefully filling with the cream. Remember that this product is ready to use and does not need any mixing.