Preparing the floor properly is crucial for a successful and long-lasting hybrid flooring installation. Here's a step-by-step guide:
-
Clear the Room:
- Remove all furniture from the room.
- Carefully remove any existing flooring, such as carpet, tiles, or vinyl.
- Take off any reusable wall trims or baseboards. Label them for easy reinstallation.
-
Clean and Inspect the Subfloor:
- Thoroughly clean the subfloor using a broom, vacuum, and damp mop.
- Ensure the subfloor is completely dry before proceeding. Moisture can cause problems later on.
- The subfloor must be solid, level, dry and clean.
-
Assess and Correct Imperfections:
- Carefully inspect the subfloor for any imperfections, such as cracks, holes, or unevenness.
- Uneven subfloors can damage hybrid flooring prematurely.
- Fill small cracks and holes with a suitable patching compound.
- For larger imperfections or unevenness, consider using a self-leveling compound to create a smooth, even surface.
-
Leveling the Subfloor (If Necessary):
- Self-leveling compound: This is essential if the subfloor has significant dips or unevenness. Follow the manufacturer's instructions carefully for mixing and application.
- Allow the self-leveling compound to dry completely before proceeding. This might take 24-48 hours, depending on the product and environmental conditions.
-
Underlayment (Optional but Recommended):
- Although some hybrid flooring comes with a pre-attached underlayment, adding a separate underlayment can provide additional benefits, such as improved sound insulation and cushioning.
- Choose an underlayment specifically designed for hybrid flooring.
- Install the underlayment according to the manufacturer's instructions, ensuring it's flat and secure.
By following these steps, you can ensure your subfloor is properly prepared for hybrid flooring, resulting in a beautiful and durable floor for years to come.