askvity

How to Install an Air Return in a Wall?

Published in HVAC Installation 3 mins read

Installing an air return in a wall involves several steps, from locating existing ductwork to cutting the hole and securing the vent cover. Here's a breakdown of the process:

1. Identify Existing Return Ducts (If Applicable)

Before you start cutting into your wall, determine if you have existing return ducts that you can tap into. Look for:

  • Existing Return Vents: Check other rooms for return vents. This will give you an idea of where the return ductwork is located.
  • Ductwork in the Attic or Basement: If you have access to these areas, you may be able to see the return duct system and identify a suitable location to connect a new return.

2. Choose the Location and Cut the Hole

Carefully consider the placement of your new return vent. Ideal locations are:

  • High on the wall: Warm air rises, so a high return will effectively draw warm air out of the room.
  • Central location: A central location helps to ensure even airflow throughout the room.
  • Away from supply vents: Avoid placing the return vent directly opposite or near a supply vent, as this can create a short circuit of airflow.

Once you've chosen a location:

  1. Mark the Cutout: Use a stud finder to ensure you're not cutting into a stud or electrical wiring. Mark the dimensions of the return vent on the wall.
  2. Cut the Hole: Using a drywall saw or utility knife, carefully cut along the marked lines.

3. Install the Return Air Ducts

This is a crucial step, and the complexity depends on whether you're connecting to existing ductwork.

  • Connecting to Existing Ductwork: If you're connecting to an existing duct, carefully measure and cut the necessary pieces of ductwork. Use metal duct tape and screws to create airtight and secure connections.
  • Running New Ductwork: If you're running new ductwork, plan the route carefully, avoiding obstructions. Use appropriate sized ductwork for the area you are serving. Secure the ductwork with straps or hangers.

4. Connect the Return Ducts to Existing Return Ductwork

This step involves connecting the new ductwork you installed to the existing return system.

  • Airtight Seal: Ensure all connections are airtight. Use metal duct tape and sealant to prevent air leaks. Leaks will reduce the efficiency of your HVAC system.
  • Secure Connections: Securely fasten the new ductwork to the existing ductwork using screws or other appropriate fasteners.

5. Install the Return Air Vent Cover

The final step is to install the return air vent cover.

  1. Position the Vent Cover: Place the vent cover over the hole in the wall.
  2. Secure the Vent Cover: Secure the vent cover using screws.

Important Considerations:

  • Building Codes: Check local building codes and regulations before starting any HVAC work.
  • Professional Help: If you are not comfortable with any of these steps, it is best to hire a qualified HVAC technician.
  • Safety: Always turn off the power to the circuit before working with electrical wiring. Wear safety glasses and gloves when cutting drywall and ductwork.

Related Articles