How Do You Make Brick Masonry?

Published in Masonry Construction 4 mins read

Brick masonry involves a systematic process of laying bricks with mortar to construct durable structures. The process generally includes preparing the site, mixing mortar, laying the bricks, and finishing the joints. Here’s a step-by-step guide:

Step-by-Step Brick Masonry Construction

  1. Preparation:

    • Site Preparation: Before beginning, ensure the foundation is level, clean, and properly cured. This is vital for a stable structure.
    • Material Gathering: Gather all necessary materials including bricks, mortar mix, cement, water, a trowel, a level, a plumb bob, a mason's line, and a hawk.
  2. Mortar Mixing:

    • Mix Ratio: Combine cement, sand, and water in the correct proportions as indicated on the mortar mix packaging. The mixture should be workable and not too dry or too wet.
    • Consistency: Ensure the mortar is consistent, meaning it should be easily spreadable with a trowel, yet maintain its shape once laid.
  3. Laying the First Course (Row):

    • Start: Begin by spreading a bed of mortar on the foundation.
    • Brick Placement: Place the first row (course) of bricks, ensuring each brick is perfectly level and aligned.
    • Leveling: Use a level to check the alignment of the bricks. Also, use a mason's line to guide straight alignment.
  4. Laying Subsequent Courses (Rows):

    • Mortar Application: Spread mortar along the top of the previous brick row and on the vertical edges (head joints) of the new brick to be laid.
    • Brick Placement: Place each brick firmly and in line with the previous course, following a stretcher bond or chosen pattern. Referencing a video, "And place the cement motor above. It with the horizontal guide. Continue the same process for the stretcher row." this part focuses on using a guide and the correct placement of mortar for each brick row, especially in a stretcher bond pattern.
    • Joint Control: Ensure that the vertical joints (head joints) do not align with the joints directly below in the course below, to provide maximum structural stability and strength.
  5. Vertical Alignment:

    • Plumb Check: Periodically check the vertical alignment using a plumb bob to ensure that the wall is straight vertically.
  • Guide: Keep the wall straight and level as you lay more courses.
  1. Joint Finishing:

    • Tooling: After the mortar has begun to set (but is not completely hard), use a jointer tool to compress the mortar in the joints and create the desired finish (e.g., concave, flush, or raked).
    • Cleaning: Remove any excess mortar. Use a brush to remove loose mortar from the face of the bricks.
  2. Curing:

    • Hydration: Keep the fresh brickwork damp for several days. This process helps the mortar hydrate properly, gaining strength over time.
    • Time: Allow for proper curing time to harden and achieve maximum strength.

Tools Required

Tool Purpose
Trowel Applying and spreading mortar
Level Ensuring horizontal levelness of bricks
Plumb Bob Ensuring vertical alignment
Mason's Line Guiding straight lines when laying bricks
Hawk Holding mortar for easy access during brick laying
Jointer Tool Finishing and compressing the mortar joints

Tips for Success

  • Mortar Consistency: The mortar must be the correct consistency to properly adhere the bricks.
  • Brick Soaking: Bricks should be soaked in water before use, to avoid absorbing moisture from the mortar. This also ensures the proper bond of the materials.
  • Stagger Joints: Ensure vertical joints are staggered for maximum strength.
  • Check Alignment: Regularly check both vertical and horizontal alignment as you work.
  • Work Clean: Keep brickwork clean as you go for better results.

By following these steps and ensuring precision, you will be able to build a structurally sound brick masonry.