askvity

What is PMR in SAP EWM?

Published in SAP EWM Production Staging 3 mins read

In SAP Extended Warehouse Management (EWM), PMR stands for Production Material Request.

The PMR is a crucial document created by the system within SAP EWM. It serves as the central request for materials needed specifically by manufacturing for a particular production or manufacturing order.

Based on the provided reference:

  • The system creates a production material request (PMR) in SAP EWM, containing the information about the products needed by production and the quantities needed for the entire manufacturing order.

Essentially, the PMR acts as a bridge between production planning (often managed in SAP S/4HANA or ECC) and warehouse execution in SAP EWM. When a manufacturing order is released or requires materials, EWM receives the relevant data and generates the PMR.

What Information Does a PMR Contain?

As highlighted in the reference, a PMR holds critical details necessary for the warehouse to fulfill the production demand:

  • Products Needed: A list of all materials, components, or raw materials required for the specific manufacturing order.
  • Quantities: The precise quantities required for each product to complete the entire production order.
  • Manufacturing Order Reference: A link back to the original manufacturing or production order that triggered the request.

How is the PMR Used in SAP EWM?

The primary purpose of the PMR is to facilitate and plan the staging of materials from the warehouse to the production supply area.

  • You plan the staging of the products over the time period when they are required by creating the staging warehouse tasks.

This means the PMR is the basis for generating the necessary warehouse tasks in EWM that direct warehouse operators to pick the required materials from storage locations and move them to the designated production staging areas at the right time.

Key Aspects of PMR in SAP EWM

Here's a summary of the Production Material Request in SAP EWM:

Aspect Description
Full Form Production Material Request
Creation Created by the SAP EWM system, typically triggered by a manufacturing order from SAP S/4HANA or ECC.
Content Contains details about products needed and their quantities for a specific manufacturing order.
Purpose Planning and execution of staging – moving materials from warehouse storage to production supply areas.
Output Basis for creating staging warehouse tasks.
Location Resides within SAP EWM.
Connectivity Links warehouse processes in EWM to manufacturing requirements from production planning systems.

Understanding the PMR is fundamental to managing the flow of goods from the warehouse to the production floor efficiently within SAP EWM. It ensures that production has the materials it needs, in the correct quantities, precisely when they are required.

Related Articles