Installing square balusters using a pin-in-hole and handrail plow method involves carefully positioning and securing each piece.
Installing Square Balusters: A Step-by-Step Guide
Based on the provided reference, one common method for installing square-top balusters on open tread stairs involves placing a pin at the base and fitting the top into a handrail plow. This process ensures structural integrity and proper alignment.
Here are the steps involved in this specific installation method:
- Place the Baluster Pin: Insert the pin located at the bottom of the baluster into the corresponding pre-drilled hole. This hole is typically located on the stair tread or the rail below.
- Swing the Top into Position: Pivot or swing the top portion of the baluster upwards and into its correct place within the routed channel (known as the plow) in the underside of the handrail.
- Plumb the Baluster: Use a level to check that the baluster is perfectly vertical (plumb). Adjust its position as needed until it is straight.
- Secure the Top: Once the baluster is plumb, firmly secure the top section of the baluster to the handrail using finished nails.
Following these steps helps ensure that each baluster is correctly oriented and securely fastened within the stair rail system.