Loading an Advanced Tape Glider (ATG) involves correctly threading the tape roll through the dispenser mechanism to ensure smooth and consistent application of adhesive.
Here's a general guide on how to load an ATG dispenser:
Loading an ATG dispenser correctly is crucial for its efficient operation and to prevent tape jams. While specific models may have slight variations, the core process typically involves opening the dispenser, inserting the new tape roll, threading the tape through the designated path, and securing it.
Step-by-Step ATG Loading Guide
Follow these steps to load your ATG tape dispenser:
- Open the Dispenser: Locate the latch or release mechanism on your ATG dispenser. This is often a trigger, button, or sliding panel that allows the housing to open, revealing the tape path and roll spindle.
- Remove the Used Roll (if applicable): If replacing an empty roll, remove the core from the spindle. Dispose of the old tape and core properly.
- Prepare the New Roll: Take your new roll of ATG tape. Ensure it is the correct type and width for your dispenser. Find the start of the tape. It's often helpful to peel back a few inches of the release liner.
- Insert the New Roll: Place the new tape roll onto the spindle inside the dispenser. Pay attention to the orientation – the adhesive side of the tape should be facing the correct direction according to the dispenser's design (usually towards the front or bottom where it will be applied).
- Thread the Tape: Guide the leading edge of the tape through the designated path within the dispenser. This path typically involves rollers or guides that separate the adhesive tape from its release liner. The release liner usually routes onto a take-up spool or core within the dispenser, while the adhesive tape goes out the front application roller.
- Route the Release Liner: Ensure the release liner is correctly routed towards the take-up mechanism. This spool winds up the used liner as you dispense tape.
- Secure the Tape: Once the tape and liner are threaded, you need to ensure they are properly seated and ready for use.
- Guide the adhesive tape out the front application roller.
- As referenced in the provided information, you will wind it forward here a little bit just to um yeah to help lock it into position. This action helps seat the tape firmly against the rollers and ensures it is ready to be picked up by the application surface.
- Close the Dispenser: Carefully close the dispenser housing until it clicks or latches securely.
- Test Application: Dispense a short length of tape onto a scrap surface to confirm it is feeding correctly and the liner is being taken up.
Key Components & Their Role
Understanding the parts of your ATG can help with loading:
Component | Function |
---|---|
Tape Spindle | Holds the new roll of adhesive tape. |
Application Roller | Applies the adhesive tape to the surface. |
Release Liner Path | Guides the backing paper away from the tape. |
Take-Up Spool | Collects the used release liner. |
Proper loading ensures the adhesive tape is cleanly separated from its liner and applied smoothly, while the liner is neatly wound up inside the dispenser, preventing tangles and jams.